Harvard Yard: April 2018  During Harvard’s Arts First Festival students - new to design and construction - assembled the Plugin House in Harvard Yard in just one day using a single tool. The Plugin House demonstration combined design with arts + culture as an animating force, bringing activity, vibrancy and audience. The Plugin House hosted site-specific installations and events including video installations, DJ sets, art exhibitions and interactive performances.

Harvard Yard: April 2018

During Harvard’s Arts First Festival students - new to design and construction - assembled the Plugin House in Harvard Yard in just one day using a single tool. The Plugin House demonstration combined design with arts + culture as an animating force, bringing activity, vibrancy and audience. The Plugin House hosted site-specific installations and events including video installations, DJ sets, art exhibitions and interactive performances.

 
 
 
DSC01045.JPG

Boston City Hall: May 2018

Partnering with Boston City’s Housing Innovation Lab, the Plugin House at Boston City Hall drew attention to the need for more creative housing solutions in the Boston metro. The Plugin House hosted an exhibition and a number of discussions led by the city with local residents and welcomed over two thousand visitors during a one week period.